Choosing a granny flat builder is not only about comparing layouts. Before you commit to a model, it helps to understand exactly what is being proposed for your property, what still needs checking, and who is responsible for each part of the work.
Whether your site is in Brisbane, the Gold Coast or elsewhere in South East Queensland, start with a clear conversation about the home, the block and the written scope. You can also read the 7-Star Rating guide for background on energy-rating questions that may arise during planning.
Granny Flats 4U sells modular granny flats and arranges installation on suitable South East Queensland sites. The questions below can help you compare proposals without assuming that two quotes cover the same work.

1. What does the written quote include?
Ask for a written scope that explains the model, layout, materials, inclusions and any allowances. A headline price on its own does not tell you enough to compare one proposal with another.
- What exact model and floor plan does the quote cover?
- Which fixtures, fittings and finishes are included?
- Are decks, stairs, verandahs, window coverings or external finishes included?
- Does the quote identify allowances or provisional items?
- What items are specifically excluded?
A clear written scope helps prevent confusion later. If an item matters to you, ask for it to be included in the written quote or clearly shown as an exclusion.
2. What information do you need about my site?
A suitable layout on paper may still need site-specific checks before it is right for a particular property. Ask what information the builder needs to assess the site properly.
Start with the suburb, intended use and number of bedrooms. Then discuss the likely location of the granny flat and the path into the backyard.
- Is there side access or driveway access?
- How wide is the narrowest part of the route?
- Are there gates, fences, trees, retaining walls, pools or existing structures in the way?
- Is the site level, sloping or difficult to reach?
- Is there enough usable space for the proposed home?
Plans or site photos can help later if you have them, but they are not essential for the first conversation. The goal is to identify the main access and placement questions early.
3. How will access affect the project?
Access is one of the biggest practical questions for modular granny flats. A tight Brisbane block, sloping Gold Coast site or limited side access can affect the planning required before installation.
Ask the builder to explain what needs to be checked before an access approach can be confirmed. This may include driveway width, side access, overhead obstacles, slopes, nearby structures and the available room around the proposed location.
Do not assume access is included simply because a home can fit in the backyard. Delivery, lifting, traffic management, crane requirements and site preparation can depend on the individual property and must be confirmed in writing.
4. What approvals or reports may be required?
Approval requirements can vary based on the property, the proposed use, the design and local rules. A builder should be able to explain which questions need to be investigated, without promising an approval outcome before the relevant checks are complete.
- What approval or certification questions need to be considered for this site?
- Are there planning, building, plumbing, energy-rating, bushfire, flood or other property-specific matters to check?
- Who will coordinate the required information or reports?
- Which parts of the process are included in the written scope?
- What remains the owner’s responsibility?
If a QBCC-licensed builder is required for the scope of work, ask how that requirement will be addressed. Keep the conversation focused on your individual site rather than relying on a general statement that every project follows the same path.
5. How are 7-star and energy-efficiency requirements handled?
Energy efficiency is another area where the final requirements can depend on the specific home and site. Orientation, glazing, insulation, ventilation and the proposed design can all affect the questions that need to be answered.
- What energy-efficiency requirements are relevant to this proposal?
- What is included in the design or assessment process?
- Are any energy-related items allowances, inclusions or exclusions?
- When will the final requirements be confirmed?
For a broader explanation, see the Granny Flats 4U 7-Star Rating guide. The important point is to keep the final scope site-specific and written down.
6. What is included with installation?
Installation is not one simple item. Depending on the site, it may involve access planning, footings or supports, connections, external works and coordination with other trades.
- Site preparation and what is needed before installation
- Footings, supports or foundations
- Delivery and placement arrangements
- Electrical, plumbing, water and sewer connections
- Stairs, decks, ramps and external access
- Who is responsible for any work outside the modular home itself
Do not assume these items are automatically included. The written quote should show what is covered, what is excluded and what still requires investigation.
7. What could change the final price?
A practical builder should explain the factors that can affect the project cost. The model is one part of the picture, but the property can also influence the final scope.
Common site-specific factors include access, slope, site preparation, approvals, services, installation requirements and selected inclusions. Ask: “What assumptions has this quote been based on?” That encourages a clear discussion about what has and has not been allowed for.
8. What timing can you confirm, and what depends on the site?
It is reasonable to ask about likely timing, but avoid treating an estimate as a guarantee before the project details are confirmed.
- What are the main stages from enquiry to installation?
- What information is needed before the timing can be confirmed?
- Which approvals, reports, selections or site works could affect the program?
- When will you receive updates if the scope changes?
9. Who is responsible for communication and coordination?
A project can involve owners, builders, certifiers, designers, suppliers and trades. Ask who your main contact will be and how decisions or changes will be recorded.
Clarify who you should contact with questions, how variation requests are handled, how scope changes are approved, when you will receive written updates and what information you need to provide at each stage.
10. Can you show me a written comparison between suitable models?
Once the site discussion has started, ask the builder to help you compare the models that genuinely suit your intended use and property. A compact one-bedroom layout may be enough for some households, while a larger design may be better for family use, guests or longer-term living.
The existing Top 10 Granny Flat Builders Gold Coast – Brisbane article can be a starting point for research, but your final decision should be based on a written proposal for your site.
Get a Quote for your Brisbane or Gold Coast site
Share your suburb, how you want to use the home and how many bedrooms you are considering. Granny Flats 4U can then discuss suitable modular granny flat options and the access, approvals, installation and inclusions questions that need to be checked for your property.
Get a Quote or call 07 5646 3729.